NestDaddy

SparkQuote NEC calculators

ai.sparkquote/nec-calculators · v1.0.1

NEC 2023 electrical calculators: wire size, ampacity, voltage drop, conduit fill, box fill, load.

Connect Remote server

Terminal
claude mcp add --transport http nec-calculators https://sparkquote.ai/mcp
~/.cursor/mcp.json
{
  "mcpServers": {
    "nec-calculators": {
      "url": "https://sparkquote.ai/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "nec-calculators": {
      "type": "http",
      "url": "https://sparkquote.ai/mcp"
    }
  }
}
Claude Desktop
Settings > Connectors > Add custom connector
URL: https://sparkquote.ai/mcp

Tools 10 found in our last check

  • wire_size

    Minimum conductor size for a circuit: NEC Table 310.16 ampacity at the termination temperature rating, the 240.4(D) small-conductor limits, voltage drop over the run, and the Table 250.122 equipment grounding conductor, increased in proportion under 250.122(B) when voltage drop…

  • voltage_drop

    Voltage drop for a given conductor size, current and one-way length, single- or three-phase, from NEC Chapter 9 Table 8 circular mils (VD = 2·K·I·L / CM, or √3 for three-phase).

  • watts_to_amps

    Current drawn by a load in watts at a voltage and power factor, single- or three-phase, plus the 125% continuous-load value.

  • conduit_fill

    Percent fill and maximum number of THHN/THWN-2 conductors of one size in EMT or PVC Schedule 40, from NEC Chapter 9 Tables 1, 4 and 5.

  • box_fill

    Minimum outlet box volume from NEC 314.16(B): conductor, device (2 each), clamp and grounding allowances times the Table 314.16(B) volume for the largest conductor.

  • load_calculator

    Dwelling service load by the NEC 220.82 optional method: 3 VA/ft² lighting, small-appliance and laundry circuits, fixed appliances, demand factor, heating or cooling, and the minimum standard service size. Leave an appliance out to count it as 0 VA.

  • ohms_law

    Ohm's law and power: give exactly two of voltage, current, resistance and power; the other two are calculated.

  • panel_schedule

    Lays circuits out on a 120/240 V single-phase or 208Y/120 V three-phase panel and totals the load per phase with the imbalance.

  • bid_calculator

    Electrical bid price from materials, markup, labor hours and rate, job costs, overhead and a target net margin (price = break-even / (1 − margin)).

  • nec_ampacity

    Allowable ampacity of one insulated conductor from NEC Table 310.16 (not more than three current-carrying conductors in a raceway or cable, 30°C ambient), before any adjustment or correction factors and before the 240.4(D) small-conductor limits.

Details

Endpointhttps://sparkquote.ai/mcp (Streamable HTTP)
First published14 Oct 2026
Last updated14 Oct 2026
Registry nameai.sparkquote/nec-calculators

More other servers See all

Listing data from the official MCP registry. Status and tools from NestDaddy's daily check. Browse all MCP servers.