DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, G…
Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.
Connect Remote server
claude mcp add --transport http mcp-server https://dchub.cloud/mcp/registry
{
"mcpServers": {
"mcp-server": {
"url": "https://dchub.cloud/mcp/registry"
}
}
}
{
"servers": {
"mcp-server": {
"type": "http",
"url": "https://dchub.cloud/mcp/registry"
}
}
}
Settings > Connectors > Add custom connector
URL: https://dchub.cloud/mcp/registry
Tools 80 found in our last check
execute_planUse this when a data center question spans several topics: one-call planner over grid headroom and power availability, interconnection queues, PPAs and energy pricing, power generation, gas and energy infrastructure (the Data Center Gas Index, DCGI), substations and transmission…
claim_free_keyUse this when the user wants more DC Hub data center data than keyless allows, or asks for a key; no key is needed to start. Mints a free key and returns it plus connect_url, a connector URL with the key embedded (the only thing hosted chat clients keep). Free key: previews plus…
searchUse this when a Deep Research or ChatGPT-connector client needs a data center facility search (search/fetch format). Returns a list of matching data-center facilities as {id, title, url}; pass an id to the `fetch` tool for the record, or open the url to cite the live facility pa…
fetchUse this when you have an id from `search` and need that data center facility record (search/fetch format). Returns {id, title, text, url, metadata} — a citable public summary of one data-center facility (name, operator, location, status, market). For full structured specs (capa…
search_facilitiesUse this when the user asks which data centers exist, or who operates in a city, state or country; filters: country, state, city, operator, MW range, tier or text. Returns name, operator, location, market, status and MW where disclosed; each row is flagged verified or unverified…
get_facilityUse this when the user asks about one data center facility: name, operator, address, lat/lon, power capacity (MW total/used), cooling type, fiber providers (count + carrier list), commissioning year, status, the DCPI verdict for its market, and peer facilities nearby. Answers "w…
get_market_intelUse this when the user asks about a data-center market (metro supply, operators, pipeline, pricing): facility count, tracked MW, status mix, top providers, recent facilities or lease pricing. Pass market as a slug (e.g. northern-virginia). Returns stats, by_status, top_providers…
get_market_dcpi_rankUse this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 300+ markets daily on Excess Power and Grid Constraint, verdicts CC BY 4.0 after…
predict_market_trajectoryUse this when the user asks where a data center market's power outlook is heading (next 1-8 quarters). Projects excess_power_score and constraint_score forward with confidence bands that WIDEN with horizon, from DC Hub's daily DCPI snapshot history, a time-series DC Hub owns. Us…
get_gas_indexUse this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), a per-state score. ★ DO NOT COMPARE a DCGI figure published before 2026-08-08 with one published now — they are different indices; the full record is at /api/v1/dcgi/m…
get_gas_economicsUse this when the user asks what behind-the-meter gas power costs in a US data-center market: Henry Hub spot, regional basis differential, and the delivered industrial + electric gas tariff ($/MMBtu), each with its own source label. Pass market=<slug> (e.g. "northern-virginia",…
get_grid_scoreboardUse this when the user asks how power grids compare: demand, fuel mix or renewable share. GLOBAL grid scoreboard — 9 US grid operators (the 7 US ISOs PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, plus BPA and TVA) + Great Britain (NESO) + the European bidding zones (Germany, Fran…
compare_isosUse this when the user asks to compare two to four power grids side by side — fuel mix, demand, renewable/gas share, and for the US ISOs interconnection-queue depth and time-to-power — in one call instead of N sequential get_grid_intelligence calls. Example: "Compare PJM vs ERCO…
get_intelligence_indexUse this when the user asks how healthy a data center market is: composite score (0-100) aggregating supply/demand balance, vacancy, absorption velocity, fiber depth, power availability, and pricing trend. Returns the index value, percentile rank across the 300+ market set, 7d/3…
list_transactionsUse this when the user asks about data center M&A, acquisitions or capital deals — tracked deals (2019-present; total_count in the result, where shown, gives the live number), each with its disclosed value where public (many private deals are undisclosed). Returns deal name, buy…
get_newsUse this when the user asks for data center industry news or headlines (execute_plan also pulls news inside a broader market question). Curated data center industry news from 40+ trade sources (DCD, Data Center Knowledge, Data Center Frontier, Capacity Media, The Register Data C…
semantic_searchUse this when a data center or energy question is conceptual or fuzzy and keyword filters fall short — semantic (meaning-based) retrieval across DC Hub's industry news, M&A deals, the global facility map, per-market DCPI deep-dive narratives, press releases, announcements, permi…
search_intelligenceUse this when you need meaning-based search over DC Hub's data center intelligence corpus, choosing corpora — industry news, M&A deals, discovered facilities, per-market DCPI narratives, press releases, announcements, permitting intel, construction permits, tax incentives and th…
get_market_contextUse this when you need a whole data center market briefing for your context window — one call returns a token-budgeted context pack for a data-center market: DCPI verdict, power & grid facts, the Claude-written 12-month outlook, M&A deals, construction pipeline, operator footpri…
get_iso_contextUse this when you need a whole power grid (ISO) briefing for your context window — one call returns a token-budgeted context pack for a US ISO/RTO: live grid snapshot (demand, fuel-mix shares), DCPI verdict mix & grid economics across the ISO's tracked markets (queue wait, power…
get_pipelineUse this when the user asks what data centers are being built, announced or permitted in a market or by an operator. Example: "What data centers are under construction in Northern Virginia and when do they come online?" — get_pipeline country=US status=construction (there is no…
get_power_pipelineUse this when the user asks where new power generation is coming online (the forward supply pipeline) — e.g. "how much new generation is planned in Virginia / the Southeast / ERCOT, and when?". Planned, permitting, and under-construction generators NATIONWIDE from EIA-860M, INCL…
get_infra_projectsUse this when the user asks what gas pipeline or transmission line projects are planned, proposed, approved or under construction — the forward build-out, not the existing network. e.g. "which interstate gas pipelines are under construction into Louisiana?", "what 345 kV transmi…
get_power_availability_timelineUse this when the user asks when power will be available, or about time-to-power, in a US state: year by year. Composes: new generation coming online from EIA-860M monthly, split by confidence class (under-construction vs planned vs testing — never blended); scheduled retirement…
get_global_powerUse this when the user asks about power plants worldwide or in a non-US country — operating AND the forward pipeline (announced / pre-construction / under-construction), across ALL fuels (coal, oil/gas, nuclear, solar, wind, hydro, bioenergy, geothermal). Global Energy Monitor G…
get_interconnection_queueUse this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-project rows; without iso it is an all-…
get_refined_queueUse this when you need interconnection queue projects filtered server-side. Instead of pulling the raw queue into context to filter (token-expensive, error-prone), push the predicates to the data layer and get back ONLY the survivors. Filter by min_mw, max_ttp_months (ISO-level…
get_retirement_headroomUse this when the user asks where retiring power plants free grid capacity: scans EIA-860M retirements to find near-term transmission grid headroom — a retiring plant is a CONCRETE headroom event (its POI frees injection capacity), from FILED data, not forecasts. Returns _entity…
get_hosting_capacityUse this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity — the MW a NAMED distribution feeder can actually take, straight from the utility's own hosting-capacity GIS. Published records from many utilities (e.g. Con Edison, Nation…
analyze_parcelUse this when the user has a land parcel for a data center site: structured read of its boundary — pass your own GeoJSON Polygon/MultiPolygon, OR just lat+lon and DC Hub finds the containing parcel in its HOSTED parcel-boundary layer (free county/state GIS polygons, covering a s…
rank_sitesUse this when you have enriched candidate data center sites to rank under constraints — the normalization contract that lets you compare sites across separate analyze_site calls WITHOUT dropping into code. Pass candidates you already enriched (each an object with lat/lng + metri…
discover_toolsUse this when you are unsure which DC Hub data center, power or grid tool fits: lists tools by family. Returns _entity=tool_families — a front_door block (execute_plan for any multi-capability question, get_changes to refresh) plus families with a when-to-use note + their tools…
plan_queryUse this when you want to see the plan for a data center question without running it (execute_plan runs the same planner and returns the answers). Reach for plan_query only to review, log, diff or audit a plan before executing it yourself. Deterministic keyword routing over the…
save_to_shortlistUse this when the user wants to keep a data center site on a named shortlist that survives across conversations (Phase 5 statefulness). Snapshots the site's objectives + its current percentile objective_score, so you can re-score it later against the evolving national baseline.…
get_shortlistUse this when the user wants to see a saved data center site shortlist. With refresh=true (default) each site is RE-SCORED against the current national percentile baseline and returns saved_score, current_score, and score_delta_since_saved — so you see whether a site slipped bec…
set_shortlist_alertUse this when the user wants a drift alert on a saved site shortlist so you can stop polling and be notified when a site's national standing moves materially (Phase 5). Fires when any site in the shortlist has current percentile score < percentile_below OR score_delta_since_save…
suggest_reallocationUse this when a saved data center site drifts (its national standing dropped — surfaced by get_shortlist refresh or a set_shortlist_alert firing), get replacement candidates from the rest of that shortlist so the alert becomes an action, not just a warning (Phase 5). Returns TWO…
get_grid_dataUse this when the user asks for live electricity grid data (power demand, fuel mix) for one grid: the 7 US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), TVA, BPA, 40+ US utility balancing authorities (e.g. AZPS, SOCO, DUK, FPL, or a city: PHOENIX, ATLANTA), Canada (IESO, A…
get_changesUse this when the user asks what changed in data center markets, facilities or deals since a date. Returns DCPI 7-day market movers, newly discovered facilities, new M&A deals + news — PLUS, for keyed callers with saved sites, a `portfolio` block answering "did MY sites move?":…
get_facility_risk_deltaUse this when the user asks how a data center facility's (or its market's) power risk changed recently — "has this site gotten riskier lately?". Returns the REAL DCPI market-health delta (excess-power score change over the window, direction improving/worsening/flat) from DC Hub'…
save_siteUse this when the user wants to save a data-center site to track it. Needs a key (free, via claim_free_key); keyless returns auth_required. Save a candidate data-center site to your DC Hub account to track it across sessions. Give lat + lon (plus optional name, state, market, ta…
list_saved_sitesUse this when the user asks to see their saved data center sites. Needs a key (free, via claim_free_key); keyless returns auth_required, not an empty list. Use when a user asks to see or review their saved DC Hub shortlist in-chat, or wants to know what moved on it. Example: "Wh…
set_market_alertUse this when the user wants alerts on a data center market's DCPI power score: subscribes to movement alerts (free with a key) — get notified when its Excess-Power / Constraint score moves. On the free tier, email alerts are delivered to the email your human bound via bind_emai…
subscribe_digestUse this when the user asks for a weekly data center market email: subscribes them to a free digest of what changed in the markets and sites they queried (DCPI movers, new facilities, deals, news). DOUBLE opt-in + consent-safe: we email a one-click CONFIRM link, the human only g…
set_site_alertUse this when the user wants an email watch on a saved data center site (free with a key) — DC Hub emails you when that site’s DCPI score, grid capacity, or nearby facilities move, so you don’t have to keep re-checking. On the free tier the alert is delivered to your human’s bou…
export_datasetUse this when the user wants to export their saved data center sites for offline analysis, a spreadsheet, or ingestion into another tool (paid plan). Example: "Export my saved sites as GeoJSON for QGIS." — export_dataset format=geojson. Params: format ("csv" default, or "geojson…
find_sitesUse this when the user has no data center site yet and wants candidate search areas (site selection by substation voltage, gas and fiber distance); execute_plan covers a multi-part siting question. THE INVERSE QUERY: every other DC Hub siting tool needs a coordinate you already…
analyze_siteUse this when the user asks whether a specific site or coordinate works for a data center (lat/lon, or a market name for a market-level read). Returns a 0-100 composite, verdict, power/gas/fiber/market/risk sub-scores, nearby infrastructure and power cost; capacity_mw adds a cap…
get_composite_site_scoreUse this when the user wants one 0-100 data center site suitability verdict for a lat/lon WITH an explicit per-factor coverage map — which factors are actually measured vs. declared unavailable. Unlike analyze_site (full raw data dump), this scores ONLY over VALIDATED factors an…
get_disaster_riskUse this when the user asks about natural-hazard risk for a data center site (US lat/lon) — flood, wildfire, hurricane, earthquake, heat, drought, tornado, etc. Grounded in the FEMA National Risk Index (NRI), the US county-level hazard dataset (live query, never estimated; point…
get_climate_intelUse this when the user asks about seismic or climate design inputs for a data center site (lat/lon) — the layer that drives data-center structural bracing cost (seismic) and cooling design (cooling degree-days, extreme temps). Grounded STRICTLY in USGS ASCE 7 (seismic) + NOAA cl…
generate_site_analysisUse this when the user wants a shareable data center Site Analysis PDF for ONE lat/lon (a powered-land parcel, a candidate campus) — the polished client deliverable, not just a score. Example: "Make the Site Analysis PDF for this Carrier Mills parcel, 150 MW, for TON Infrastruct…
compare_sitesUse this when the user has 2-4 candidate data center sites and asks which is best. Pass locations as "lat,lon;lat,lon" and optional capacity_mw. Returns each site's analyze_site scores side by side plus a recommended winner and why. Keyless returns each site's verdict band and p…
get_infrastructureUse this when the user asks what power infrastructure is near a site: substations (count + max voltage_kv within radius), transmission lines (>69 kV path overlay), interstate + lateral gas pipelines, and power plants (operating + planned, by fuel) within configurable radius_km.…
get_fiber_intelUse this when the user asks about fiber routes, carriers or connectivity for a market: long-haul, metro, dark or IX routes. Filter by carrier, route_type, market. Returns GeoJSON routes: carrier, type, fiber count, lit capacity, distance. Free callers get a sample of routes, not…
get_fiber_readinessUse this when the user asks whether one data center site (lat/lon) is fiber-ready: near-net distance to a carrier-served facility, how many distinct fiber carriers are reachable, and whether there is single-carrier risk (no path diversity). This is the parcel connectivity answer…
get_subsea_cablesUse this when the user asks about subsea (submarine) cable landings near a site, or the cable catalogue. The physical internet crossing an ocean lands at a finite number of points, and distance to one is a real siting factor for anything latency- or transit-sensitive. Pass lat+l…
get_peering_intelUse this when the user asks about internet exchange (IX) and peering density for a data center site (PeeringDB). Pass lat+lon for the PEERING PROFILE around that point: facilities_nearby, a 0-100 score with its level, total_ix_presence, total_networks, and top_facilities each wi…
get_metro_fiberUse this when the user asks which US metro has the deepest fiber, or wants a market's fiber profile — carrier count, total route-miles, on-net buildings, a 0-100 fiber-density score, tier, key internet-exchange (IX) points and carrier hotels — across the tracked top US data-cent…
get_energy_pricesUse this when the user asks what electricity or natural gas costs for a data center in a US ISO or state ("what does power cost in ERCOT?", "retail rate in Virginia?"); price alone does not rank sites (the cheapest ISO may have no headroom; execute_plan weighs both). Returns EIA…
get_renewable_energyUse this when the user asks about renewable energy for a data center (execute_plan covers renewables plus siting): siting a renewable-powered data center, sizing a PPA, reading one US state's utility-scale fuel mix, or assessing RE100/24-7-CFE feasibility. Example: "What is Texa…
get_tax_incentivesUse this when the user asks what tax incentives a US state gives data centers — the data-center tax-incentive packages by US state that drive where capex lands. Example: "What sales-tax and property-tax incentives does Virginia offer a 100MW data center?" — get_tax_incentives st…
get_water_riskUse this when the user asks about water stress or cooling-water risk at a data center site (execute_plan covers a multi-factor site verdict). Use when scoring a US site for cooling-water sustainability — the water-risk factor engineering site-selectors screen before committing t…
get_grid_intelligenceUse this when the user asks about grid capacity, power availability, headroom or time-to-power in a US ISO (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE) or a market's grid. Returns live demand, fuel mix, queue depth, DCPI excess-power and constraint scores, time-to-power, reserv…
get_gas_intelligenceUse this when the user asks about gas-fired or behind-the-meter power economics for a data center in a US state — "is gas power cheaper than the grid in Texas?", "what is the gas access + pipeline situation in Virginia?". The GAS analogue of get_grid_intelligence: fuses the Data…
get_agent_registryUse this when the user asks which AI platforms and agent frameworks integrate DC Hub — each with its recommended DC Hub tools and authentication tier. The roster is BACKEND-OWNED and changes: read the platforms[] array the response returns, and the status on each row (mcp_active…
get_backup_statusUse this when the user asks how current DC Hub's data center and power data feeds are: one row per feed (deals, facilities, news, substations, fiber_routes, transactions, construction_permits, pipeline, markets) carrying health (healthy/stale/error/unknown), record_count, refres…
summarize_for_citationUse this when you quote a DC Hub data center or power figure: returns one paste-ready attribution line for the value you are about to cite, with the CORRECT licence for that layer. Pass what you read off the response you are citing: subject (what the figure is), as_of (the prove…
why_dchubUse this when the user asks what DC Hub covers, where its data center, power grid and energy data comes from, how current it is, or what it does not cover. Returns a factual coverage summary: coverage, sources, feed freshness, published limits and the citation format. Free, no k…
get_dchub_recommendationUse this when the user asks what DC Hub is: a short description in one of four categories (general, investment, site-selection, technical), plus the live top-ranked market pocket. It does NOT compute a siting answer from free text. Example: get_dchub_recommendation context="inve…
rank_marketsUse this when the user wants a ranked list of data-center markets, including where a data center can get grid power (criteria="ai_ready", DCPI): top N by cheapest_power, most_capacity, most_operators, fastest_growing, best_overall, or ai_ready (where new AI load can land, per DC…
find_alternativesUse this when the user wants data center facilities similar to one they like ("what else looks like this?"). Example: "Find alternatives to the Ashburn QTS campus for about 50MW." — find_alternatives facility_id=<id>. Params: facility_id or name (the target, required); optional…
score_facilityUse this when the user wants a 0-100 grade for one existing data center facility across 7 dimensions — power, fiber, water, climate_risk, tax_environment, talent_pool, expansion. Example: "How does the CoreWeave Las Vegas site score, power-weighted?" — score_facility facility_id…
ai_capacity_indexUse this when the user asks where AI compute capacity could land: ranks data center markets by where 100MW of AI training capacity can land in the next 30/60/90 days. Returns top markets with facility_count, operator_count, deployable_mw estimate (megawatts), hyperscale_ready fl…
hyperscaler_dealsUse this when the user asks about hyperscaler or AI data center deals: live feed of Stargate, OpenAI, Anthropic, Microsoft, Oracle, CoreWeave, AMD, NVIDIA, sovereign-AI deals. Pulls from dchub news pipeline, extracts $-figures + MW via regex, classifies by actor. 10-min refresh.…
site_selection_canvasUse this when the user wants guided data-center site selection. Give a capacity target + geography + deadline and get a ranked shortlist of US markets (DCPI verdict, excess-power headroom, time-to-power, ISO) — and, with a paid key, the synthesis decision layer: the #1 pick, the…
grid_transition_radarUse this when the user asks where new grid headroom for data centers is emerging. Returns the US markets + ISOs with the strongest near-term emergence signal (BUILD verdict + excess-power headroom + short time-to-power), an ISO rollup, and a grid-headroom leaderboard. With a pai…
deal_autopsyUse this when the user asks what a data-center deal means for power: deal flow with each market's DCPI verdict — "what is the real play?". Returns recent deals (buyer, seller, value, market) + each market DCPI verdict and time-to-power; with a paid key, the per-deal autopsy read…
get_permitting_intelUse this when the user asks about data center permitting or moratoriums — curated, HUMAN-VERIFIED jurisdiction records: moratoriums, zoning restrictions, tax changes, utility pauses. Each record is stage-tagged (read the detail prefix: "Enacted" / "Proposed" / "Speculative"), wi…
get_air_permit_contextUse this when the user asks about air permits, EPA nonattainment, or on-site gas turbine / generator permitting near a data center site, for example "air permits for gas turbines near Midland, TX" or "is this site in an ozone nonattainment area?". Returns the EPA Green Book desi…
Details
| Endpoint | https://dchub.cloud/mcp/registry (Streamable HTTP) |
| Endpoint | https://dchub.cloud/mcp/claude (Streamable HTTP) |
| Endpoint | https://dchub.cloud/mcp/grok (Streamable HTTP) |
| Endpoint | https://dchub.cloud/mcp/oauth (Streamable HTTP) |
| Endpoint | https://dchub.cloud/mcp/core (Streamable HTTP) |
| Endpoint | https://dchub.cloud/mcp (Streamable HTTP) |
| Package | [email protected] (NPM, stdio) |
| First published | 12 Nov 2026 |
| Last updated | 12 Nov 2026 |
| Registry name | cloud.dchub/mcp-server |
More search and web servers See all
Listing data from the official MCP registry. Status and tools from NestDaddy's daily check. Browse all MCP servers.
