NestDaddy

Harrowgate Group Tools

com.harrowgategroup/tools · v1.0.0

Planning tools for commercial paving and site work.

MCP Score How we grade

A+
96 / 100

From what our daily checks can see without credentials, last checked 22 Nov 2026.

Reliability
Answered 6 of 6 daily checks.
30 / 30
Speed
Typical response 94 ms.
20 / 20
Tool docs
12 of 12 tools have a full description; 109 of 109 inputs have a description.
25 / 25
Stability
No tool rewrites in 30 days.
15 / 15
Listing
Missing a source or website link, an icon.
6 / 10

How to raise the grade

  • Add a source or website link, an icon to your server.json in the official MCP registry.
Fixed something? Run the same check now. The grade updates at once.

Connect Remote server

Terminal
claude mcp add --transport http tools https://harrowgategroup.com/mcp
~/.cursor/mcp.json
{
  "mcpServers": {
    "tools": {
      "url": "https://harrowgategroup.com/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "tools": {
      "type": "http",
      "url": "https://harrowgategroup.com/mcp"
    }
  }
}
Claude Desktop
Settings > Connectors > Add custom connector
URL: https://harrowgategroup.com/mcp

Tools 12 found in our last check

  • asphalt_concrete_calculator

    Tonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Material estimate from the numbers entered. It is not a quote and does not include base, forming, rein…

  • trench_shoring_checker

    Whether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Every parameter is optional and has a default. Preliminary planning only. Regulations are amended from…

  • excavation_spoil_volume_calculator

    Bank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of…

  • hydro_excavation_vs_mechanical_checker

    Which excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter is optional and has a default. Preliminary planning only. This covers electrical distribution lines…

  • rebar_quantity_calculator

    Bar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary planning only. Take the bar list, cover, laps and hooks from the drawings; the engineer of record…

  • curb_sidewalk_concrete_calculator

    Concrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional and has a default. Preliminary planning only. A volume is one input to a quote; base, forming, reinf…

  • accessible_parking_calculator

    Minimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. Every parameter is optional and has a default. Preliminary planning only. Municipal zon…

  • gravel_and_granular_base_calculator

    Tonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Every parameter is optional and has a default. Preliminary planning only. The project specification, th…

  • parking_lot_striping_and_stall_layout_calculator

    Stalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. Every parameter is optional and has a…

  • concrete_slab_thickness_and_reinforcing_guide

    Minimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. Every parameter is optional and has a default. Guidance only, not a slab design. Loads…

  • snow_load_and_snow_removal_volume_calculator

    Cubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and has a default. Planning estimate only. Real snow varies with temperature, wind, rain and time on the…

  • excess_soil_tracker_and_reuse_site_checker

    Which parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. Every parameter is optional and has a default. General information on the regulation, not legal or…

Details

Endpointhttps://harrowgategroup.com/mcp (Streamable HTTP)
First published16 Nov 2026
Last updated16 Nov 2026
Registry namecom.harrowgategroup/tools

More other servers See all

Listing data from the official MCP registry. Status and tools from NestDaddy's daily check. Browse all MCP servers.