Planning tools for commercial paving and site work.
MCP Score How we grade
From what our daily checks can see without credentials, last checked 22 Nov 2026.
| Reliability Answered 6 of 6 daily checks. |
30 / 30 |
| Speed Typical response 94 ms. |
20 / 20 |
| Tool docs 12 of 12 tools have a full description; 109 of 109 inputs have a description. |
25 / 25 |
| Stability No tool rewrites in 30 days. |
15 / 15 |
| Listing Missing a source or website link, an icon. |
6 / 10 |
How to raise the grade
- Add a source or website link, an icon to your server.json in the official MCP registry.
Connect Remote server
claude mcp add --transport http tools https://harrowgategroup.com/mcp
{
"mcpServers": {
"tools": {
"url": "https://harrowgategroup.com/mcp"
}
}
}
{
"servers": {
"tools": {
"type": "http",
"url": "https://harrowgategroup.com/mcp"
}
}
}
Settings > Connectors > Add custom connector
URL: https://harrowgategroup.com/mcp
Tools 12 found in our last check
asphalt_concrete_calculatorTonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Material estimate from the numbers entered. It is not a quote and does not include base, forming, rein…
trench_shoring_checkerWhether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Every parameter is optional and has a default. Preliminary planning only. Regulations are amended from…
excavation_spoil_volume_calculatorBank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of…
hydro_excavation_vs_mechanical_checkerWhich excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter is optional and has a default. Preliminary planning only. This covers electrical distribution lines…
rebar_quantity_calculatorBar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary planning only. Take the bar list, cover, laps and hooks from the drawings; the engineer of record…
curb_sidewalk_concrete_calculatorConcrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional and has a default. Preliminary planning only. A volume is one input to a quote; base, forming, reinf…
accessible_parking_calculatorMinimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. Every parameter is optional and has a default. Preliminary planning only. Municipal zon…
gravel_and_granular_base_calculatorTonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Every parameter is optional and has a default. Preliminary planning only. The project specification, th…
parking_lot_striping_and_stall_layout_calculatorStalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. Every parameter is optional and has a…
concrete_slab_thickness_and_reinforcing_guideMinimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. Every parameter is optional and has a default. Guidance only, not a slab design. Loads…
snow_load_and_snow_removal_volume_calculatorCubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and has a default. Planning estimate only. Real snow varies with temperature, wind, rain and time on the…
excess_soil_tracker_and_reuse_site_checkerWhich parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. Every parameter is optional and has a default. General information on the regulation, not legal or…
Details
| Endpoint | https://harrowgategroup.com/mcp (Streamable HTTP) |
| First published | 16 Nov 2026 |
| Last updated | 16 Nov 2026 |
| Registry name | com.harrowgategroup/tools |
More other servers See all
Listing data from the official MCP registry. Status and tools from NestDaddy's daily check. Browse all MCP servers.
