NestDaddy

Spark Pack

io.github.Nero-Engine/spark-pack · v1.1.0

Cable sizing, Part P, certificate checks and G98/G99 for UK electricians' AI assistants

Connect Remote server

Terminal
claude mcp add --transport http spark-pack https://spark-pack.nerolabs.workers.dev/mcp
~/.cursor/mcp.json
{
  "mcpServers": {
    "spark-pack": {
      "url": "https://spark-pack.nerolabs.workers.dev/mcp"
    }
  }
}
.vscode/mcp.json
{
  "servers": {
    "spark-pack": {
      "type": "http",
      "url": "https://spark-pack.nerolabs.workers.dev/mcp"
    }
  }
}
Claude Desktop
Settings > Connectors > Add custom connector
URL: https://spark-pack.nerolabs.workers.dev/mcp

Tools 7 found in our last check

  • list_capabilities

    Lists Spark Pack's tools, the regulations edition it targets, what it covers (nations, circuit types, cable types, installation methods) and what it deliberately does not do. Free, needs no input.

  • size_cable

    Sizes a UK final circuit or sub-main and shows the working: design current (with cooker diversity), protective device rating, the smallest cable size that passes current-carrying capacity, voltage drop (3% lighting, 5% other) and earth fault loop impedance (Zs against the maximu…

  • check_part_p

    Answers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and what to do next (self-certify through a competent person scheme within 30 days, or tell building control before startin…

  • get_certificate_schema

    Returns the fields an Electrical Installation Certificate (eic), Minor Electrical Installation Works Certificate (minor_works) or Electrical Installation Condition Report (eicr) needs, as a JSON Schema the assistant fills from the job notes and test readings (spark-pack-certs-1.…

  • check_certificate

    Checks a filled EIC, Minor Works certificate or EICR (shape from get_certificate_schema) and returns `ready_to_transfer`, every missing required field by path, errors (readings that fail: insulation resistance under 1 megohm at 500 V, measured Zs above the maximum for the breake…

  • check_grid_connection

    For solar PV, batteries, V2G chargers, EV chargers and heat pumps in Great Britain: says which network operator process applies and when. Generation: G98 (fully type tested, 16 A / 3.68 kW per phase or less: install, then notify within 28 days) or G99 (apply and wait for accepta…

  • trade_profile

    Checks the electrician's own business details (Nero Trade Profile v1: trading name, Companies House number, competent person scheme and number, postcode, contact) and returns them cleaned, with a stable `nero_trade_ref` computed from the scheme registration or company number. Th…

Details

Endpointhttps://spark-pack.nerolabs.workers.dev/mcp (Streamable HTTP)
First published13 Nov 2026
Last updated13 Nov 2026
Registry nameio.github.Nero-Engine/spark-pack

More other servers See all

Listing data from the official MCP registry. Status and tools from NestDaddy's daily check. Browse all MCP servers.